If your reroof adds or moves downpipes, settle their drainage connections before the roofer fixes the final outlet positions.

- PGDB licensed
- Site Safe member
- Impac Prequal assessed
- Kiwi-owned since 2012
How it works
Call or enquire
Phone us or send the address and what you’re seeing.
We assess
A licensed Stately plumber looks at the job on site.
Clear quote
You get a plain explanation and a clear quote before work starts.
Job done and tidied
We finish the work and leave the site clean.
Send the roof plan, proposed downpipe locations and photographs of the ground below each outlet. Stately covers Whangaparāoa. The first drainage task is to check where rainwater currently goes and what underground work the revised roof layout needs.
Match the roof outlets to the drainage scope
Mark new, retained and redundant downpipes separately on the plan. Include the roofer’s expected sequence, scaffolding positions and any paving or planting that limits access. Photographs should show each wall down to ground level. Add available drainage drawings, but keep proposed routes separate from records of existing pipes.
At the property, we compare those details with the actual outlets and accessible drainage points. The designer checks the roof drainage arrangement and required capacity. We establish the underground installation scope from that information rather than choosing pipe sizes from photographs or simply matching the nearest visible pipe.
Locate the receiving pipe before opening trenches
A nearby buried pipe is not automatically the right connection. We locate the intended stormwater route, check accessible junctions and establish levels at the proposed tie in. Trial excavation can expose the receiving pipe so its material, condition and position can be checked before the full trench is opened.
We also establish whether the affected pipe is private or public. Owners maintain private drainage, while Auckland Council manages public stormwater. If the proposed excavation approaches Watercare assets, approval for working near those pipes may be needed. That check belongs before excavation, not after a public pipe is exposed.
More about drainlayer in Whangaparāoa
Agree the route and coordinate roof work
Once levels and connection points are known, we agree the trench route and working area with the owner or builder. Keep scaffold foundations, access paths and material storage clear of the excavation plan. Confirm which surfaces will be lifted and where excavated material can sit during the pipe installation.
The builder should check consent needs against the actual drainage alterations using MBIE guidance. Restricted drainlaying needs an appropriately authorised person, whose authorisation can be checked through the PGDB register. Resolve those arrangements before booking the trench closure, particularly where an inspection must happen while the pipework remains visible.
Lay branches for the revised downpipe positions
We excavate the agreed route, prepare the pipe bedding and lay branches to the confirmed connection points. Junctions and transitions must suit the pipe materials being joined. The installation follows the established levels, with support along the pipe and accessible points kept available for future maintenance rather than buried beneath finishes.
Where an old downpipe moves, we deal with its redundant underground branch as part of the work. A damaged section exposed at the connection is assessed before deciding the repair extent. Coordinate the final downpipe alignment with the roofer so the above ground outlet meets the installed drainage connection properly.
Test before covering and record the finished route
Allow a programme hold point before backfilling. We test the installed drainage and check the completed connections, with any required inspection arranged at the appropriate stage. Give the roofer and builder that sequence early. Covering pipes first can prevent inspection of bedding, joints and the connection to the existing drain.
At handover, provide a record of the installed route, connection locations, testing and any inspection documentation. Photograph exposed pipework before covering it. Agree whether lifted paving, concrete, lawn or planting is being reinstated or left ready for another trade. Record unfinished surfaces clearly so the builder can programme their completion.
Drainlayer: questions from Whangaparāoa
Can the roofer position the new downpipes first?
Share proposed positions before fixing them. Underground levels, connection access and trench routes need checking so the roofing and drainage work meet at practical locations.
Can every extra downpipe join the existing drain?
The receiving route, condition and capacity need assessment. The designer confirms the drainage arrangement where required. An additional junction alone is not evidence that the existing system can accept the revised roof drainage.
Should paving wait until the reroof is finished?
Keep the drainage work accessible until connections are completed, tested and any required inspection is recorded. Coordinate final paving with both trades so finishing the roof does not require reopening a newly restored surface.
More help in Hibiscus Coast
Read before you call
Google reviews
Rated Excellent
Real words from Auckland customers on Google.
Thomas was professional, fast and efficient. He explained things clearly, and honestly. We were about to leave for the South Island for the weekend, Thomas made sure the job was completed in good order before we left. He also checked-in with us periodically to ensure there were no further issues.
2 / 5