To change from onsite wastewater disposal to a public sewer connection, start by sending the property plan, existing system records and any Watercare correspondence.

- PGDB licensed
- Site Safe member
- Impac Prequal assessed
- Kiwi-owned since 2012
How it works
Call or enquire
Phone us or send the address and what you’re seeing.
We assess
A licensed Stately plumber looks at the job on site.
Clear quote
You get a plain explanation and a clear quote before work starts.
Job done and tidied
We finish the work and leave the site clean.
Stately covers Papakura for drainage work. The first task is to confirm the proposed connection and route, rather than disconnect the current system. Keep that system operating until the approved changeover sequence is ready and everyone understands when wastewater use must stop.
Confirm the connection before planning excavation
Send the owner or builder’s contact details, site address, drainage drawings and photographs showing tank access, buildings and proposed trench areas. Include planned extensions or other work that could affect the route. Identify who can authorise excavation and who holds the application documents so instructions reach the right person.
A new wastewater connection follows Watercare’s application, inspection and completion process. Confirm its connection requirements before ordering pipework or booking the changeover. The designer must also confirm council requirements for retiring the onsite disposal arrangement. Use MBIE guidance to check building consent requirements against the actual work, including alterations to existing drainage.
Locate both systems and measure the route
Onsite, we locate the house drain, tank inlet, existing treatment components and proposed public connection position. Available records guide the investigation, but exposed pipe positions and measured levels inform the route. We check other buried services, access for excavation and places where stored spoil would obstruct occupants or building work.
The available fall determines whether a gravity route is workable. Any pumped solution needs the designer’s input and confirmation of council or Watercare requirements before installation. Where excavation or building work approaches public wastewater pipes, check Watercare’s approval requirements early. Mark the agreed trench and surface removal limits before digging begins.
More about drainlayer in Papakura
Lay the new drain before switching flows
We excavate the agreed route, expose the connection points and prepare bedding for the specified pipework. The new private drain is laid to the confirmed levels, with suitable access points and supported joints. Damaged existing pipework at the junction is assessed onsite before deciding whether to repair it or replace a longer section.
Arrange the final diversion around the inspection programme and the household’s wastewater use. Explain which toilets, showers and sinks must remain unused during that stage. Keep roof and surface water separate from the wastewater connection. Agree who will arrange emptying and retirement of the old tank and disposal components under the confirmed requirements.
Keep testing ahead of trench closure
Restricted drainlaying must be carried out by an appropriately authorised person. Check the PGDB register when appointing the person responsible for this connection. Before work starts, establish who books inspections, who receives results and which pipe sections must stay exposed. These decisions affect excavation sequencing and when reinstatement can begin.
We test the installed pipework as required for the work and check the changed flow path before normal use resumes. Coordinate Watercare’s connection inspections and completion requirements with any building consent inspections. Correct defects and record the outcome before covering inspected sections. Avoid scheduling finished paving while access to joints or connection points is still needed.
Close out the old route and reinstate
At handover, provide the drainage layout showing the new route, junctions and access points, together with test results and available inspection and completion records. Record how the former connection was isolated and include the separate tank retirement documentation. Explain any remaining work clearly so an unused component is not mistaken for an active drain.
Backfill and compact excavated areas in sequence, then reinstate the agreed surfaces. Identify any paving, planting or other finishing left for another contractor. Owners maintain private pipes; Watercare manages public wastewater. Showing that boundary on the handover information helps the owner direct future maintenance enquiries and keep access points clear.
Drainlayer: questions from Papakura
Can we disconnect the tank first?
Keep it operating until the replacement route, inspection stages and changeover are coordinated.
What if the sewer connection is too high?
Have levels measured onsite. The designer must resolve the route or pumping arrangement before excavation proceeds.
Who deals with the redundant tank?
Nominate that contractor before changeover and retain their retirement records with the drainage handover documents.
More help in South Auckland
Read before you call
Google reviews
Rated Excellent
Real words from Auckland customers on Google.
Actually awesome and the reviews are correct… on time, job well done and sorry about the bad replacement tap I provided you.
5 / 5