If a private drain crosses the footprint of new foundations, resolve its route before foundation excavation begins. Send the proposed foundation plan, available drainage drawings and photographs of visible drain access points.

Aerial view of an open drainage trench on the South Head site.
  • PGDB licensed
  • Site Safe member
  • Impac Prequal assessed
  • Kiwi-owned since 2012

How it works

  1. Call or enquire

    Phone us or send the address and what you’re seeing.

  2. We assess

    A licensed Stately plumber looks at the job on site.

  3. Clear quote

    You get a plain explanation and a clear quote before work starts.

  4. Job done and tidied

    We finish the work and leave the site clean.

Stately Plumbing covers Northcote for drainage enquiries. We use that information to plan onsite checks, then agree the diversion sequence with the builder so drainage work and footing construction fit together.

Set out the foundation conflict first

Mark the proposed walls, footings and excavation limits on the plan you send. Include structural details and the intended construction sequence. Tell us which fixtures still discharge into the affected drain and whether the building will remain occupied. That helps plan how wastewater will be managed while the pipe is disconnected.

The designer needs the confirmed drain position and levels to resolve the crossing. Consent requirements depend on the actual alteration. Use MBIE guidance with the designer to establish what documentation and council involvement the diversion needs before digging starts, rather than treating it as a routine repair.

Locate both ends before choosing the route

Onsite, we check accessible chambers, pipe entries and the proposed connection points. Targeted excavation exposes the existing drain where its position, depth and condition need confirmation. Available service information and onsite locating checks guide where those openings go. A line on an old drawing alone is not enough to set trench levels.

Confirm which pipe is private before planning the cut. Owners maintain private pipes, while Watercare manages public wastewater pipes. If the foundation excavation or diversion approaches a Watercare asset, check its working near assets process because approval may be required. Keep that decision ahead of excavation and foundation bookings.

More about drainlayer in Northcote

Agree a buildable diversion and excavate it

With the existing levels exposed, the proposed route can be checked against the foundation design. We discuss pipe fall, connection depth, access for maintenance and room to work beside the footings. The designer resolves structural clearances and any foundation detail affected by the trench. Do not order pipe from a sketch alone.

Agree where excavated material will go and which paths must remain usable. Open the diversion trench in the agreed sequence, protecting exposed services and keeping foundation excavation coordinated with the builder. Record the surfaces being disturbed, including paving edges and garden areas, so reinstatement responsibilities are clear before those surfaces are lifted.

Lay the replacement before closing the old route

The new pipework is laid on prepared bedding along the agreed alignment. We check levels, joints and the transitions into the existing drain as installation proceeds. The diversion must serve the intended upstream fixtures and reach the confirmed downstream connection. Redundant pipe sections are dealt with as specified in the agreed work.

Restricted drainlaying needs an appropriately authorised person. Check the proposed drainlayer's authorisation through the PGDB register before appointing them. Programme the cutover with the occupants and builder, explaining when connected fixtures must stay unused. Keep the necessary joints exposed for testing and any required inspection before backfilling removes access.

Release the trench and record what remains

Testing checks the completed diversion before it is covered. Book any required inspection to match that stage, rather than the foundation pour. Record test results and inspection outcomes, and address any outstanding items before the trench is released for backfilling. The builder needs that status before proceeding with adjacent foundation work.

At handover, provide the installed route, connection positions, useful photographs and relevant inspection records. Explain where access points remain and which old sections were removed or abandoned. Backfill and surface reinstatement should match the agreed scope. Identify any paving, planting or final finishes left for another contractor.

Drainlayer: questions from Northcote

Can the diversion sit beside a footing?

The designer must check the exposed drain levels, trench position and structural details before that route is settled.

When should we book the foundation pour?

Coordinate it after the drainage testing and required inspection stages are confirmed, allowing outstanding work to be completed first.

What if the exposed pipe differs from the drawing?

Pause the affected excavation. Record its position and levels, then have the route and foundation interface reviewed before continuing.

More help in North Shore

Read before you call

Google reviews

Rated Excellent

Real words from Auckland customers on Google.

Thomas was professional, fast and efficient. He explained things clearly, and honestly. We were about to leave for the South Island for the weekend, Thomas made sure the job was completed in good order before we left. He also checked-in with us periodically to ensure there were no further issues.
Wesley ChinnapperGoogle review

2 / 5

Get in touch today

Need a job done?

Have a question, need a quote, or require a plumber? Our Auckland team is here to help, available 24/7.

022 159 2013info@statelyplumbing.co.nz

Service area: Auckland & surrounding areas. Residential, commercial, plumbing, gasfitting & drainage.

0 of 600 characters

Urgent? Call 022 159 2013, 24/7.

Call 24/7Request a quote