For a restaurant tenancy refit, settle the drainage route before kitchen equipment and finished floors block access. Send the proposed kitchen layout, fixture schedule, existing drainage drawings and builder’s programme first.

- PGDB licensed
- Site Safe member
- Impac Prequal assessed
- Kiwi-owned since 2012
How it works
Call or enquire
Phone us or send the address and what you’re seeing.
We assess
A licensed Stately plumber looks at the job on site.
Clear quote
You get a plain explanation and a clear quote before work starts.
Job done and tidied
We finish the work and leave the site clean.
Stately covers Newmarket. We use that brief to plan onsite checks and agree where excavation, pipe installation and inspection sit within the refit, rather than treating drainage as a task after cabinetry arrives.
Resolve kitchen discharge before ordering equipment
Mark sinks, dishwashers, floor wastes and any proposed grease management equipment on the layout. Include equipment discharge information and show which positions are fixed. The designer and Watercare requirements for commercial discharge must be confirmed before pipework is finalised. That decision affects what needs connecting and which routes remain practical.
Ask the designer to coordinate drainage with equipment clearances and cleaning access. Have the actual alterations checked against MBIE consent guidance before setting the construction sequence. Give the builder a coordinated drawing, with unresolved fixture positions clearly marked, so floor preparation does not overtake decisions that could change the buried work.
Locate the receiving drain and excavation limits
Onsite, we check accessible drainage points, compare them with available records and establish the proposed connection location. Existing pipe condition, material, levels and direction need checking before choosing between reuse, repair and replacement. A drawing alone cannot settle whether the receiving drain suits the proposed restaurant layout.
Set out trench routes against walls, foundations, services and retained finishes. Agree who clears equipment and protects adjoining areas before cutting or digging starts. Where excavation approaches public wastewater assets, check Watercare’s approval requirements before proceeding. Record the agreed excavation boundary so the builder can coordinate other trades around open trenches.
More about drainlayer in Newmarket
Lay the buried work before closing floors
Once the route and design are settled, we excavate the agreed areas and expose the connection points carefully. The work might involve new branches, replacement of unsuitable sections or repair where the existing drain joins the new layout. Keep exposed pipework accessible while its condition and connections are checked.
Lay pipework to the approved project requirements, checking bedding, joints, levels and support as installation proceeds. Coordinate riser positions with the kitchen installer before floor construction covers them. Keep access points reachable after equipment is fitted. Restricted drainlaying needs an appropriately authorised person; check the proposed drainlayer’s authorisation through the PGDB register.
Hold the programme for testing and inspection
Put drainage testing and required inspections into the builder’s programme before booking trench closure or floor finishes. Agree who requests each inspection and who receives the result. Leave joints and connection work accessible as required for those checks, rather than arranging an inspection after the evidence has been covered.
If the refit needs a new wastewater connection, allow for Watercare’s application, inspection and completion process as a separate programme item. Confirm the required test method and inspection stages for the actual work. Address defects or requested changes, then obtain the relevant release before backfilling and handing the area to following trades.
Hand over usable access and clear records
Before covering the installation, record pipe routes, connection positions and access points with photographs and updated drawings. Include test results and inspection records in the handover pack. Identify any remaining completion paperwork and who will submit it, so the tenancy handover is not confused with administrative completion.
Agree surface reinstatement responsibilities before excavation starts. At handover, state which trenches are backfilled, which floor repairs are complete and which finishes remain with the builder. Show the restaurant operator where drainage access remains available, keeping those locations clear of permanent cabinetry or stored equipment.
Drainlayer: questions from Newmarket
What should we send before the kitchen layout is final?
Send the current drawing with uncertain equipment positions marked, fixture discharge details and available drain records. Identify who can approve layout changes.
Can the builder close trenches before kitchen installation?
Coordinate closure after the required drainage checks and inspection release. First verify riser positions against equipment drawings and retain access for subsequent connections.
Who confirms whether grease equipment is needed?
The designer must confirm the commercial discharge requirements with Watercare. Provide the proposed kitchen activities and equipment information before settling that part of the drainage layout.
More help in Central Auckland
Read before you call
Google reviews
Rated Excellent
Real words from Auckland customers on Google.
Actually awesome and the reviews are correct… on time, job well done and sorry about the bad replacement tap I provided you.
5 / 5