For a commercial kitchen refit, plan new floor wastes before ordering floor finishes or fixing equipment positions. Send the kitchen layout, proposed waste locations, equipment schedule and available drainage drawings first.

- PGDB licensed
- Site Safe member
- Impac Prequal assessed
- Kiwi-owned since 2012
How it works
Call or enquire
Phone us or send the address and what you’re seeing.
We assess
A licensed Stately plumber looks at the job on site.
Clear quote
You get a plain explanation and a clear quote before work starts.
Job done and tidied
We finish the work and leave the site clean.
Stately covers Manukau for drainage work. We use that information to discuss access and the proposed installation, then check the existing drainage onsite before agreeing where excavation and connections will go.
Match each waste to the kitchen layout
Mark preparation benches, cooking equipment, wash areas and doorways on one drawing. Show where staff expect washdown water to collect and which equipment has a separate discharge. Include proposed finished floor levels and the flooring contractor’s details. These establish the questions for the designer rather than a pipe layout decided from photographs.
The designer and Watercare requirements for commercial discharge must be confirmed, including any grease treatment arrangements. Resolve these before setting outlet positions. A waste beneath fixed equipment needs particular attention because cleaning access matters after the kitchen is fitted out. Keep equipment moves visible on the shared drawing.
Locate the connection before opening the floor
Onsite, we check accessible drainage points, trace the proposed route and establish connection levels. Existing drawings help, but the pipe position and condition need checking where the new branch will join. We also identify nearby services and discuss slab information with the builder before marking the excavation.
Agree the cutting boundary, spoil route and protected access through the premises. Separate exposed drainage work from food preparation and storage areas. Where excavation approaches public wastewater pipes, check whether Watercare approval is required before proceeding. Confirm asset ownership too, because the owner maintains private drainage while Watercare manages public wastewater.
More about drainlayer in Manukau
Set pipework around confirmed floor levels
Excavate the agreed trenches and expose the receiving pipe carefully. Check its material, size, level and condition at the connection. If that section needs repair, record the finding and agree the additional scope before joining new work to it. Keep the builder informed of anything affecting the floor opening.
Lay the new branches and waste fittings to the confirmed design, with suitable bedding, joints and access for maintenance. Coordinate outlet heights with the floor build up, falls and waterproofing details. Restricted drainlaying needs an appropriately authorised person. The PGDB register lets the owner or builder check that authorisation before work starts.
Hold the programme for checks before covering
Use MBIE guidance to check consent requirements against the actual alteration, then confirm the inspection sequence for the job. Book the floor repair and finishing trades around that sequence. Leave joints and connections accessible for required testing and inspection instead of treating the concrete pour as an immovable deadline.
Test the installed drainage using the method required for the work and record the result. Arrange required inspections before backfilling or covering. If the refit includes a new wastewater connection, follow Watercare’s application, inspection and completion process. Allow for correcting findings and obtaining acceptance before the trench is closed.
Close the trench with a usable record
After the required checks, backfill and compact around the pipework as specified. Confirm who reinstates the slab, waterproofing and final floor finish. Leave the agreed excavation area tidy and record any temporary protection or unfinished surfaces. Waste openings must remain protected from concrete, grout and construction debris during subsequent trades.
Hand over a marked layout showing the installed route, connection point and accessible fittings. Include photographs taken before covering, test results and applicable inspection records. Record any approved changes from the original layout. Give the kitchen operator waste locations and cleaning access details so equipment placement preserves access.
Drainlayer: questions from Manukau
Can we move a waste after the floor is marked?
Raise the change before excavation. We check the revised route and levels onsite, and the designer checks its fit with equipment and floor falls.
Should the flooring contractor attend before pipework is laid?
Coordinate early. Confirm finished levels, waste interfaces and waterproofing details before setting fittings. These decisions affect both drainage installation and the finished kitchen floor.
What should remain accessible at handover?
Keep waste grates and specified maintenance points reachable. Show them on the equipment layout and handover record so later cabinets or appliances do not obstruct cleaning.
More help in South Auckland
Read before you call
Google reviews
Rated Excellent
Real words from Auckland customers on Google.
James, came on time. Clean, pleasant. Checked what needed to be done. Worked fast. Good communication
3 / 5