Adding a roof over your deck means planning where its downpipes will discharge before posts, decking and paving close off access.

- PGDB licensed
- Site Safe member
- Impac Prequal assessed
- Kiwi-owned since 2012
How it works
Call or enquire
Phone us or send the address and what you’re seeing.
We assess
A licensed Stately plumber looks at the job on site.
Clear quote
You get a plain explanation and a clear quote before work starts.
Job done and tidied
We finish the work and leave the site clean.
Send the proposed roof plan, downpipe positions and photos of the ground beneath and beside the deck. Stately covers Māngere Bridge as part of its Auckland service area. We check the drainage route onsite so the underground connection can be coordinated with the builder’s programme.
Start with the roof and deck drawings
Send drawings showing the covered area, gutter outlets, deck height, post locations and proposed footings. Include any drainage plans you hold and mark surfaces you want retained. Tell us whether the deck frame is already built. These details help organise access and show where drainage could clash with structural work.
Agree who supplies and fits the downpipes, and where our underground work begins. The designer needs to settle roof drainage details and any changes to the approved layout. Check consent requirements for the actual roof and drainage work using MBIE guidance before setting the excavation programme.
Locate the receiving pipe before choosing a trench
We locate the intended stormwater connection, check accessible pipework and establish its position and depth onsite. A nearby lid alone is not enough to choose a connection. We also check the route against footings, buried services and the space needed to excavate beside or beneath the deck.
The owner maintains private drainage, while Auckland Council manages public stormwater assets. Establishing that boundary helps define the connection scope. If excavation approaches public wastewater pipes managed by Watercare, its approval requirements need checking. The trench route should be settled before post holes or concrete restrict the available working space.
More about drainlayer in Māngere Bridge
Excavate while the deck structure stays accessible
Coordinate excavation with the builder before decking boards are fixed over the proposed route. We mark the agreed trench and expose the connection area carefully. Excavation needs room for safe working, pipe bedding and joint assembly. Keep stockpiled material and machinery clear of footing excavations and the builder’s access route.
We check exposed pipe condition and levels before laying the new branch. If the receiving pipe needs repair, agree that work before connecting into it. Any proposed route change near a footing goes back to the builder or designer so drainage work and structural support remain coordinated.
Lay the branch and inspect before covering
We lay the underground stormwater branch on prepared bedding, with alignment, fall and pipe selection established for the assessed layout. Connections from each planned downpipe are positioned to suit the finished deck and ground levels. Any access points need to remain reachable after boards, screens and landscaping are installed.
Restricted drainlaying must be carried out by an appropriately authorised person, whose authorisation can be checked through the PGDB register. Programme the required testing and inspections while pipework remains visible. We check joints and flow through the completed connection, then resolve inspection items before backfilling or enclosing the work beneath decking.
Finish the ground and keep a usable record
After the required checks, we backfill around the pipework and reinstate the excavated area to the agreed scope. Confirm beforehand whether that means prepared ground, replaced paving or another specified finish. The builder can then complete the deck while keeping drainage access clear and downpipe connections protected from damage.
At handover, keep photos taken before backfilling, the recorded pipe route, connection locations and relevant test and inspection records together. Note who completes any remaining surface work. These records help an owner find the branch later and give future builders information before they alter the deck or excavate beside it.
Drainlayer: questions from Māngere Bridge
Should the trench go in before the deck posts?
Coordinate both layouts first. The onsite route and footing positions determine the sequence. Installing drainage before access closes usually makes the connection easier to inspect.
Can two downpipes share one underground branch?
That needs assessment against the roof catchment, pipe levels and receiving drainage. Send both outlet positions so the designer and drainlayer can check the arrangement.
What if no suitable stormwater connection is found?
Pause the connection work. A designer must assess the discharge arrangement, with council requirements confirmed for any proposed soakage or detention solution.
More help in South Auckland
Read before you call
Google reviews
Rated Excellent
Real words from Auckland customers on Google.
Actually awesome and the reviews are correct… on time, job well done and sorry about the bad replacement tap I provided you.
5 / 5