For a building project with a stormwater detention tank, send the drainage drawings, tank details and full property address first.

- PGDB licensed
- Site Safe member
- Impac Prequal assessed
- Kiwi-owned since 2012
How it works
Call or enquire
Phone us or send the address and what you’re seeing.
We assess
A licensed Stately plumber looks at the job on site.
Clear quote
You get a plain explanation and a clear quote before work starts.
Job done and tidied
We finish the work and leave the site clean.
The connection work needs to fit the approved drainage arrangement and the building programme, especially before paving closes access. Stately’s published coverage extends north to Mangawhai. Start by identifying who holds the current design and who can approve changes during excavation.
Start with the tank connection details
Send the site plan showing the tank, roof drainage, proposed outlet and discharge destination. Include the tank manufacturer’s connection details and the designer’s drawings for the flow control and overflow. Mark any differences between those documents and what has already been built. Photographs help explain access, but levels need checking onsite.
The designer and relevant council requirements for detention must be confirmed before pipework is set out. Check consent requirements against the actual building and drainage scope, using MBIE guidance. Resolve missing outlet information before excavation so the crew has a defined connection arrangement rather than an unanswered design question.
Check levels and protect the excavation route
Onsite, we check the tank position, inlet and outlet levels, pipe routes and the receiving connection. We compare these with the drawings and locate existing services along the proposed trench. The builder should identify foundation work, scaffolding and delivery routes that could obstruct excavation or damage exposed drainage.
Agree where excavated material will go and how people will move around the work. We dig the connection trenches and expose the receiving pipe sufficiently to check its material, condition and level. Any mismatch goes back to the designer before the trench or tank connection is altered. Keep access available for inspection.
More about drainlayer in Mangawhai
Lay the inlet, controlled outlet and overflow
We lay the specified stormwater pipes between the collection points, tank and approved discharge connection. Bedding supports the pipework, while joint selection follows the pipe and tank connection details. At the tank wall, the connection needs proper support so settlement or backfilling does not pull against the fitting or tank seal.
The controlled outlet and overflow have different functions. We follow the designer’s arrangement for each, including their levels and accessible inspection points. We check existing pipework before joining new sections and repair or replace damaged sections within the agreed scope. Restricted drainlaying needs an appropriately authorised person; check their authorisation through the PGDB register.
Hold inspection points before covering pipes
Put testing and required inspections into the builder’s programme before booking backfill or paving. We check the installed routes, levels, joints and tank connections against the drawings. Testing follows the requirements for the actual installation. Keep joints and connection points exposed where they need to be examined.
A water check alone cannot confirm that the detention design is correct. The installed outlet control and overflow arrangement also need checking against the specified details. Record test results and resolve inspection findings before covering the work. If a connection changes onsite, obtain the necessary design direction and update the installation record.
Finish surfaces and hand over accessible drainage
After the required checks, we backfill around the pipes and connections with suitable support and compaction. Confirm the surface finish beforehand: reinstating a garden strip differs from preparing a driveway trench for another contractor. Record who completes concrete, asphalt or landscaping so unfinished surfaces have a clear place in the programme.
Handover should include the installed pipe route, connection positions, photographs taken before backfilling, test records and relevant inspection documentation. Include tank and outlet information supplied for the project. Show the owner where access points remain available, and keep them clear of paving, planting and stored materials.
Drainlayer: questions from Mangawhai
Can the tank outlet join the nearest drain?
The receiving pipe and discharge destination must be checked onsite against the design. Proximity alone is not a connection instruction.
What if the installed tank is too low?
Send measured levels to the designer before connecting pipes. The designer needs to resolve the arrangement, rather than the crew improvising an outlet.
When should the builder book paving?
Book paving after testing, required inspections and backfilling are complete. Confirm finished access cover levels before the surface contractor starts.
More help in North Shore
Read before you call
Google reviews
Rated Excellent
Real words from Auckland customers on Google.
Thomas was professional, fast and efficient. He explained things clearly, and honestly. We were about to leave for the South Island for the weekend, Thomas made sure the job was completed in good order before we left. He also checked-in with us periodically to ensure there were no further issues.
2 / 5