If your builder is setting slab, driveway or landscaping dates, send the drainage drawings and construction programme before those dates are fixed.

- PGDB licensed
- Site Safe member
- Impac Prequal assessed
- Kiwi-owned since 2012
How it works
Call or enquire
Phone us or send the address and what you’re seeing.
We assess
A licensed Stately plumber looks at the job on site.
Clear quote
You get a plain explanation and a clear quote before work starts.
Job done and tidied
We finish the work and leave the site clean.
Drainage needs access for excavation, installation, testing and inspection before surfaces close over it. Stately covers Glen Innes as part of its Auckland coverage. The first discussion should identify which building stages depend on buried pipes and who can approve changes when site measurements differ from the drawings.
Set drainage hold points with the builder
Send the latest site plan, foundation drawings, drainage layout and available service records. Include proposed finished levels, access arrangements and the builder’s sequence for slabs, retaining work and paving. Mark drawing revisions clearly. A superseded fixture layout can put a drainage connection on the wrong side of a foundation.
Agree who releases each work area and who confirms that it can be covered. Put excavation, pipe installation, testing and inspections into the programme as separate activities. Use an appropriately authorised person for restricted drainlaying and check authorisation through the PGDB register. Confirm consent requirements for the actual work using MBIE guidance.
Locate routes before opening trenches
Onsite, we compare the drawings with visible connections, boundaries, foundation positions and measured levels. Existing service information guides locating, but the excavation route needs checking on the ground. The builder should identify crane areas, scaffold positions and delivery routes so an open trench does not interrupt another critical activity.
Excavation exposes the relevant existing pipe or connection point and creates access along the agreed route. We check exposed pipe condition, depth and alignment before joining new work to it. Building or excavation near public wastewater pipes may require Watercare approval. Resolve that interface before treating the trench as ready to proceed.
More about drainlayer in Glen Innes
Install around confirmed building interfaces
Lay the specified wastewater and stormwater pipework to the confirmed design, with bedding, joints and access points checked as installation proceeds. Keep each system’s route clear in the work records. Where existing private drainage needs repair or replacement, agree the affected length after exposure rather than extending the scope from drawings alone.
Coordinate crossings and building entry points with the builder before concrete or other permanent work blocks access. Check pipe positions against current foundation and fixture information. Refer level conflicts or changed connection positions to the designer. Record approved changes immediately, so the next trade works from the same information as the drainage crew.
Keep inspection ahead of backfilling
Arrange the applicable tests and inspections while the relevant work remains accessible. Check the installed pipework against the agreed layout and investigate any test failure before covering it. The builder needs a clear release point, not an assumption that a completed trench means inspection and testing are also complete.
For a new wastewater connection, allow for Watercare’s application, inspection and completion process in the programme. Keep connection approval separate from the builder’s internal signoff. After testing and the required inspections, backfill with suitable material and agreed compaction. Coordinate trench closure with subsequent construction loads and the specified surface build up.
Hand over records and surface status
At handover, provide records of installed routes, connection locations, approved changes, test results and inspection documentation relevant to the work. Label records by building or lot where several areas are involved. Photographs taken before covering help the owner and builder understand where pipes sit beneath completed surfaces.
State which excavated areas have been reinstated and which remain prepared for another trade. Record temporary surfaces and outstanding paving or landscaping work with the builder. Keep access points reachable. Owners maintain private pipes, Watercare manages public wastewater, and Auckland Council manages public stormwater.
Drainlayer: questions from Glen Innes
What if the slab date moves forward?
Ask the builder to review drainage hold points first. Confirm installation, testing and inspection status before bringing concrete work forward. A changed date needs coordination, not just a shorter excavation window.
Can fixture positions change after trenches are opened?
Send revised drawings before installation continues. We check the affected route onsite, and the designer confirms changes to levels or layout. Record the accepted revision before covering pipes.
Who finishes the driveway over the trench?
Agree that responsibility before digging. Handover should distinguish completed drainage backfill from driveway preparation and final surfacing, with remaining work assigned to the relevant trade.
More help in East Auckland
Read before you call
Google reviews
Rated Excellent
Real words from Auckland customers on Google.
James, came on time. Clean, pleasant. Checked what needed to be done. Worked fast. Good communication
3 / 5