Adding a bathroom to a garage means finding a workable wastewater route before fixing the toilet and shower positions. Send the proposed layout, site plan and photos of the garage floor and outside access first.

- PGDB licensed
- Site Safe member
- Impac Prequal assessed
- Kiwi-owned since 2012
How it works
Call or enquire
Phone us or send the address and what you’re seeing.
We assess
A licensed Stately plumber looks at the job on site.
Clear quote
You get a plain explanation and a clear quote before work starts.
Job done and tidied
We finish the work and leave the site clean.
Stately covers Epsom. Onsite checks then establish how the new drainage can connect and what excavation the conversion needs.
Set the bathroom layout against drainage levels
Mark the proposed toilet, shower and basin positions on the drawing. Include the intended finished floor level and any planned floor build up. Send available drainage plans, consent drawings and details of other conversion work. These give the drainlayer and designer a common starting point before anyone orders bathroom fittings.
Onsite, we check the proposed outlet positions against the available connection depth and route. A shower outlet needs space below the finished surface, not just space on the plan. The designer resolves layout and structural details. Confirm consent requirements for the actual conversion and drainage work using MBIE guidance and council advice.
Locate the connection before opening the slab
We locate accessible drain entries and check the existing private wastewater pipe, its direction, depth and condition at the proposed junction. Existing drawings help guide this work, but measured positions inform the excavation. The route needs to serve the bathroom while keeping future drain access usable after the garage becomes occupied space.
Owners maintain private pipes, Watercare manages public wastewater, and Auckland Council manages public stormwater. Establish which asset the proposed work reaches before planning the connection. Building or excavation near public wastewater pipes may require Watercare approval. Keep that approval step ahead of excavation rather than treating it as a handover task.
More about drainlayer in Epsom
Coordinate trenching with the conversion programme
Agree the excavation route with the builder before floor cutting begins. Check underground services and any footing crossings. Structural instructions govern work around foundations. Mark the trench and the area needed for spoil and materials. Keep a clear route for other trades and separate the open work area from everyday access.
Excavate the agreed floor openings and outside trench to expose the connection and prepare the pipe route. Check exposed pipework before making the junction. If the connection area needs repair, settle that scope before extending the drain. Coordinate floor openings with the builder so drainage installation precedes floor repairs and bathroom finishes.
Lay the drain and inspect before covering
Lay the specified wastewater pipework on prepared bedding, with the route, levels and access provisions checked against the agreed design. Connect the bathroom drainage to the confirmed wastewater junction. Repair or replace affected existing pipework where included in the scope. Coordinate outlet positions with the plumber before the floor is closed.
Restricted drainlaying requires an appropriately authorised person; check authorisation through the PGDB register. Programme testing and required inspections while the work remains exposed. Record results and resolve defects before backfilling. For a new public wastewater connection, follow Watercare’s application, inspection and completion process, with its required checks built into the builder’s programme.
Close the trench and document the route
After testing and inspection, backfill and compact the trench in the agreed sequence. Confirm who reinstates the concrete floor, external paving and other disturbed surfaces. Coordinate the floor repair with the builder’s moisture protection and bathroom finishing details. State the surface finish included in the drainage scope before excavation starts.
At handover, provide the drainage layout, photographs taken before covering, test results and inspection records relevant to the work. Note connection locations and access points so later alterations can avoid the drain. Walk through the reinstated areas with the owner or builder and record any remaining surface work allocated to other trades.
Drainlayer: questions from Epsom
Should I buy the shower tray first?
Wait until its outlet position and required floor space have been checked against the drainage levels. Give the designer the product details before finalising the layout.
Can the new toilet use the nearest outside drain?
The drainlayer checks its purpose, depth, condition and connection suitability onsite. Proximity alone is not enough to select the bathroom connection.
When can the builder close the floor?
After pipe installation, successful testing and required inspections are complete. Agree this hold point before booking concrete reinstatement or bathroom finishing work.
More help in Central Auckland
Read before you call
Google reviews
Rated Excellent
Real words from Auckland customers on Google.
Excellent service and reliable people will definitely use them again
4 / 5