Kitchen renovation decisions often become difficult when the gas connection is considered after the joinery has been ordered.

- PGDB licensed
- Site Safe member
- Impac Prequal assessed
- Kiwi-owned since 2012
How it works
Call or enquire
Phone us or send the address and what you’re seeing.
We assess
A licensed Stately plumber looks at the job on site.
Clear quote
You get a plain explanation and a clear quote before work starts.
Job done and tidied
We finish the work and leave the site clean.
For an Ellerslie project, bring the proposed layout to Stately Plumbing while locations can still be changed. Our certified gasfitters cover Ellerslie and can discuss the gas work alongside your appliance plan. The useful starting point is the finished kitchen you intend to use, not an instruction to move a pipe before anyone has checked the whole arrangement.
Start with a drawing that shows what will change
Mark the present cooking position, the proposed appliance location and any walls or cupboards scheduled for removal. A simple annotated plan can expose an important difference between replacing a hob in place and moving it across the room. Include the appliance model if selected. If it is not selected, identify that decision as outstanding rather than giving a guessed specification to the kitchen designer. Ask which details are needed before the gasfitter can assess the route and define the work.
Put a hold point before closing walls
If the renovation exposes wall or floor spaces, coordinate assessment before those areas are covered again. Open access can help inspection, but it does not mean every visible pipe can be moved or reused. The gasfitter should determine what belongs in the gas scope. Ask the builder who will communicate when access is available and who can approve any revised route. A photograph of an exposed wall is useful background, not permission for another trade to alter gas fittings while waiting.
More about gas fitter in Ellerslie
Resolve the appliance and joinery interface
Installation instructions may affect the surrounding cabinetry and the space needed for service access. Arrange for the relevant requirements to reach the person manufacturing the kitchen, rather than passing on a verbal summary through several people. Discuss what will remain accessible after drawers and panels are installed. If an appliance substitution is proposed later, return to the specification check. An alternative product is not automatically interchangeable merely because the supplier describes it as the same size or the designer prefers its appearance.
Separate gas work from the rest of the programme
A renovation booking should identify what the gasfitter is being asked to assess, disconnect, install and reconnect. Confirm who handles joinery changes, finishes and any electrical work. These are related tasks but they are not all gasfitting. Make one person responsible for communicating schedule changes. If the kitchen will be unusable between visits, plan household meals around that possibility instead of assuming a connection can be restored during an incomplete stage. Ask how unexpected findings will be reported before further work proceeds.
Treat commissioning as a planned final stage
Do not put the first cooking session ahead of testing and handover. Stately uses certified gasfitters and provides the certification paperwork the regulations require. A certificate of compliance is required for all general and high risk gasfitting, and is optional for low risk work. Once the installation is connected, the person who connects it must also issue a gas safety certificate saying it is safe to use. Check the PGDB register for the practitioner's licence history and relevant class, including who will certify the installation work.
Keep safety separate from renovation troubleshooting
If gas is smelled during or after building work, stop treating the matter as a programme delay. Do not operate electrical switches, use a phone in the affected area or introduce a flame. Leave and call from a safe place outside, away from the smell. Ring 111 where anyone is at risk. Do not ask another trade to investigate by opening fittings or trying ignition. After reaching safety, tell the appropriate contact what work was underway and which spaces may be affected.
Gas fitter: questions from Ellerslie
When should the gasfitter join the kitchen planning?
Before appliance positions, benchtop openings and closed wall spaces become fixed decisions. An early discussion can identify what information is missing and what needs inspection. It is still important to confirm the final appliance, because a preliminary layout does not settle every installation requirement.
Can the builder move the gas pipe during demolition?
Gas alterations belong with the appropriately licensed gas worker. Tell the builder which installation is affected and arrange the gas work separately. Do not treat access created by demolition as authority for someone else to disconnect or reposition fittings.
What if the kitchen delivery date changes?
Tell Stately as soon as the sequence changes and explain what will actually be ready. Discuss access, appliance delivery and any outstanding cabinet work together. Confirm availability directly rather than assuming the original connection booking remains suitable for a partly completed kitchen.
More help in Central Auckland
Read before you call
Google reviews
Rated Excellent
Real words from Auckland customers on Google.
I had the team come out to install a gas hot water system for me recently and it was an absolute pleasure to have these guys come out and do some work for me. The response time from me requesting the work, to the work being completed, was the best I have ever had! They showed up on time, the communication was great, they are super efficient and they did a top quality job! Couldn't ask for anything more. Highly recommend these guys!
1 / 5